At 2:15 p.m. CDT, the Discoverer Enterprise resumed containment operations following a short outage caused by a lightning strike at 9:30 this morning. The U.S. Coast Guard gave authorization for the operation to resume at 1:40 p.m. after the ship’s crew completed safety and operational assurance inspections.
The shut-down of the containment system was a precautionary move designed to protect the health and safety of the crew during the incident. There were no injuries and all safety systems operated as designed.
BP press office, London: +44 (0)20 7496 4076, bppress@bp.com
BP Press Office,Houston, (281) 366-4463, uspress@bp.com
Unified Command Joint Information Center, +1 985-902-5231